
The longest Metro corridor — New Garia-Airport — of the city saw light at the end of the tunnel with Railway Board approving Rs 527 crore for modified alignment of its last 3.6km stretch from City Centre II to Airport. The elevated Metro corridor will now run along the periphery of Airport land parallel to VIP Road before it goes underground to reach the station where it will have an interface with Noapara-Airport Metro. The tender will be opened on July 30.
from https://ift.tt/3gspuBA
via
IFTTT
Comments
Post a Comment