
Bijon Setu, which connects Gariahat with Kasba and EM Bypass, will remain shut from May 14 to early morning of May 18 as the Kolkata Metropolitan Development Authority (KMDA) will conduct load capacity and other structural tests. The authorities are already conducting load tests of Karunamoyee bridge.
from https://ift.tt/3fTGPEm
via
IFTTT
Comments
Post a Comment